top of page
Search

Set Up Stagehand - Groove Armada

  • elainehague1999
  • Dec 26, 2022
  • 1 min read

November 2022 - Outdoor Stage


Elaine spent the day a part of the set up team for one of Groove Armada's outdoor shows on their New Zealand tour. The day began by unloading the trucks then running cables from side of stage to front of house. She then began work alongside the lighting team, hanging, cabling and taping a variety of large scale lights which were then flown. As backline was being loaded in Elaine began work with a small team to build various sizes of risers.


Recent Posts

See All
SetUp and LoadOut Stagehand - B&tB

December 2022 - Theatre Venue Elaine worked alongside venue and local staff to set up this theatre venue for its upcoming two week run...

 
 
 

Comments


Wellington New Zealand

  • LinkedIn
  • Instagram

© 2023 Elaine Hague

bottom of page