top of page
Search

SetUp and LoadOut Stagehand - The Killers

  • elainehague1999
  • Dec 26, 2022
  • 1 min read

November 2022 - Arena Stage


On their 79th stop on the Imploding the Mirage Tour Elaine worked alongside local and international crews over two days to set up and then load-out for this arena show.

This work began by unloaded road cases from trucks and moving them around the arena so set up work could begin. The first part of set up Elaine was involved in was a part of the video team where be ran cables around the edge of the arena from front of house to back of house. Later in the day she got switched to the lighting team where she assisted in positioning lights on stage and ensure they all had power and data cables.

When it came to load-out Elaine was assigned to the audio team where as soon as then show ended the team moved in to first pack away the subs then bring down the flown line arrays and get all of this safely in its home and out to the trucks to be loaded for the next show.

Recent Posts

See All
SetUp and LoadOut Stagehand - B&tB

December 2022 - Theatre Venue Elaine worked alongside venue and local staff to set up this theatre venue for its upcoming two week run...

 
 
 
Set Up Stagehand - Groove Armada

November 2022 - Outdoor Stage Elaine spent the day a part of the set up team for one of Groove Armada's outdoor shows on their New...

 
 
 

Comments


Wellington New Zealand

  • LinkedIn
  • Instagram

© 2023 Elaine Hague

bottom of page